  Input Application No
 CCC Certification
 Scope
 Major processes for certification
 General requirements for certification
 


 ■ General requirements for certification

Application for certification

□  In principle, application unit  shall be defined according to different product families, models /types, specifications, working principles, constructions in terms of product safety, the components having significant influence on EMC performance.

□ In principle, the application shall be made according to application unit. The products, of same model/type, of same manufacturer, but from different manufacturing premises, shall be in different application units, but only one type testing is required.

Application documents

The formal application shall be submitted with the following documents:
1.Product assembly chart, circuit diagram;
2.List of critical components and/or materials
3.Description of the difference between the different model/type of products in the same application unit.
4.Other necessary documents.

 

Type testing


□The principles of sample delivery for type testing

The representative samples from the units of application for certification shall be selected and supplied for type testing. According to requirements, samples of other products covered by the application unit should be supplied for additional testing on differences

□Test standards, items and methods for type testing


The test standards for certification are specified

□Test items
1.Test items for safety
2.Test items for EMC

□The type testing shall be carried out according to the methods specified and/or referred in the standards.


Initial inspection of the factory

□Contents of the inspection; The contents of factory inspection shall include the factory quality assurance ability assessment and the products consistency check.

□Timing of factory inspection:

The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 1 to 4 man-day for each processing premises.


Evaluation of certification results and approval of certification

 

Follow-up inspection